Problem #2 (Not too bad so far), How to fit the septic system tank into a hole that contains more Rock then an episode of The Flintstones. So in comes the big guns, a 12 tonne rock breaker spent 6 hours breaking the rock and digging an enormous hole to fit the tank. The final product isn't too bad, except the huge pile of rock left over. Good thing the neighbor wants it to do some retaining with.
Monday, June 16, 2008
Driveway and Paths Finished
Saturday, June 14, 2008
Now the Concreters turn.
A Grinding Halt
Getting Ready to Paint
The painters have been in to mask up all of the cupboards, floors and windows to get ready to spray the undercoat. They have been fighting with the plasterers to get the cornice finished in time, and thier persistence paid off. We are a flat mid beige on the walls, with a 1/4 sahde on the ceilings instead of the old Ceiling white.
Subscribe to:
Posts (Atom)